|
Wherever loading takes place, our inspectors will monitor the entire process. This includes a condition evaluation of the shipping container, verification of product information, quantities being loaded, packaging compliance, and overall supervision of the loading process. Once the container is loaded, an GS seal is applied to the container to reduce the high risk of product substitution after loading.
THE LSI INCLUDES:
- Record of weather, arrival time of container, container No., truck No.
- Container inspection to assess damage, moisture, perforation, smell test
- Quantity of goods and condition of outer packaging
- Random selection of sample cartons to verify actual packaged products
- Supervise the loading process to minimize breakage and maximize space utilization
- Seal the container with the customs¡¯ seal and GS seal
- Record the seal Nos. and departure time of containers
|
|